Hi Yinka,

 

By reviewing the both schedules:

 

In QA Scheduling:

 

  • The cycle start is called with EX (13WK)
  • Then the other cycle follows (14,15WK. Then CX (16). Then 17,18,19WK. Then CX (20). Then 21,22,23WK. Then CX (24). Then 25W. Then FX (26). Then 27W. Then CX (28))

 

In PRD Scheduling:

 

  • The cycle start is called with BX (5th WK)
  • The other cycle followed is (6,7 WK. Then CX (8). Then 9,10,11 WK. Then CX (12). Then EX (13) etc.

 

By adjusting the start of cycle you can do the sink.

 

Cheers,

Raj