Hi Girish
You can do that without any exit or BAdI.
The planning strategy assigned to the material master has a higher priority than the planning strategy assigned to the MRP Group.
Therefore, you can simply assign the desired planning strategy directly to the material master on tab MRP3.
BR
Caetano